Projects Archive | United Energy Developers
call 021-87700982 call
info@uedco.net email email
search
United Energy Developers menu search
  • Home
  • About us
    • UEDCO
    • Mission & Vision
    • Board of Directors
    • Certificates & Awards
    • Organization Chart
  • Field of Activities
    • Power Generation
    • Water Industry
    • Oil Gas and Petrochemicals
    • Investment
    • Supervision
  • News
  • Projects
  • HR
    • Recruitment
    • Development & Maintenance
    • Salary
    • Gallery
  • Contact us
logo
close
place Home / Projects

Projects

Rey Combined Cycle Power Plant

The Project is defined as the reconstruction plan of existing and old Rey Power Plant located in ...
مشاهده بیشتر

Caspian 460MW Single Shaft Class F Combined Cyc...

This power plant is Iran's first single shaft CCPP, with 26 months contractual period for gas unit ...
مشاهده بیشتر
Sirjan

Sirjan 25MW CHP Plant

This Project was awarded to UED on EPC basis by Sirjan Niroo Gostar Company and currently the first ...
مشاهده بیشتر
Orumieh

Steam Portion of Orumieh Combined Cycle Power P...

The aim of this project was to increase the efficiency and electrical capacity of existing simple ...
مشاهده بیشتر
kish

Kish Gas Field Development Electrical Power Pla...

The aim of building Kish Power Plant and Steam Generation project was supplying energy consumption ...
مشاهده بیشتر
Bandar Lengeh

Water Desalination Plant of Bandar Lengeh

This plant consists of two 2500 cubic meter units and Sazeh Sazan Company awarded this project to ...
مشاهده بیشتر

Contact Us

Phone Number

+98 21 87700982

Fax Number

+98 21 88514001

Address

No. 6, 10th St, Ahmad Qasir (Bokharest) St, Tehran, Iran.
PO.BOX 1514735511

Quick Access

  • Home
  • UEDCO
  • Projects
  • Board of Directors
  • Organization Chart
  • Contact us

Our Location

Copyright © 2020 by United Energy Developers
Design By Websepanta

WEEK 6 PPR RANKINGS:Adidas Yeezy Boost 350 V2 Antlia Reflective 3255 On the flip side, the Patriots, Colts, Titans, Steelers, Dolphins, Chiefs, Packers, and Ravens have been especially stingy. Every colorway that has dropped in this model has sold out and has resold marginally above retail at least. "Roger Nielsen brings a rock solid product, manufacturing and sales background to this position paired with a razor sharp focus on technology, quality and customer service. Entries received after this time and entries delivered by hand will not be accepted. This is cached page on VietNam Breaking News.Cheap Yeezys 350 Release Portable space heaters should be plugged directly into an outlet (not an extension cord) and placed at least three feet from anything that can burn; including bedding, paper, walls, and even people. Speedify speeds up uploads, downloads, web browsing and streaming while protecting your online activity, and this 3 year subscription gives you access on 5 devices. "We thought we needed both of those players, but after we mulled it over and discussed it, the selection was to go with Booker Reese,"Cheap Yeezys 350 Kids Herock told SI.